Optimization
Test Time optimization
Salland Engineering is highly experienced in optimizing existing test programs. This does not mean that all test programs can be optimized. There can be several reasons why an existing test program is not optimal. Salland Engineering investigates the possibility of reducing test time and provides a quotation indicating the guaranteed test time reduction.
Single to parallel conversion
Due of production cost it can be cost effective to convert existing single site test programs to dual, quadruple or even octal site test programs. Salland Engineering has successfully performed numerous conversions for memory, VLSI and mixed signal devices.